Construction and stringing

Built safely, span by span.

Our crews carry the line from the first foundation to energization, with every step inspected and documented.

Site works

From access roads to the last span.

  • Access roads, right-of-way clearing and work areas
  • Foundations: excavation, piling, concrete and anchor bolts
  • Tower assembly and erection, pole setting
  • Insulator and hardware installation
  • Conductor and earth wire stringing with tension machines, sagging and clamping
  • Earthing of every structure
Testing and handover

Energized only when everything is checked.

  • Inspection of foundations, structures and clearances
  • Earth resistance measurements
  • Conductor and joint checks
  • Line tests before energization, together with the utility
  • Handover file with as-built drawings and test reports
  • Health, safety and environmental procedures on every site

Planning a new line or an upgrade?

Send us the route, the voltage and the target date. Our engineers will propose the design, the materials and the programme.